Fluid Bed Installation

Scope:

  • Installation of Fluid bed and Augers
  • New Platforms and walkways
  • Stainless Purge welded Pipework
  • Fabrication of Feed Hoppers
  • Assist with Commissioning
  • Installation of Bag House

Date Completed: December 2008

Client: Cedenco Ltd

Main Contractor: GEA Process Ltd

Engineer: Universal Engineering Ltd

© Universal Engineering Limited
Website Design and Content Management System Powered by e-Cluster - Gisborne Web Design New Zealand